As a whole, our group worked great together. Throughout the process of redesigning the bike light, we met multiple times outside of class in order to further the design of the product. As a summary of the dynamic behind appropriation of work, each individual project was generally undertaken by each member of the group. However, once it came time to execute our plans for each task, one specific group member would take it as their responsibility. For example, everyone in our group contributed to the design and prototyping of the product, but I was given the responsibility of constructing and painting it. Zach, Morgan, Liz, and I worked great together and I would work with them again on another project as well.
Monday, October 21, 2013
Group Dynamic
As a whole, our group worked great together. Throughout the process of redesigning the bike light, we met multiple times outside of class in order to further the design of the product. As a summary of the dynamic behind appropriation of work, each individual project was generally undertaken by each member of the group. However, once it came time to execute our plans for each task, one specific group member would take it as their responsibility. For example, everyone in our group contributed to the design and prototyping of the product, but I was given the responsibility of constructing and painting it. Zach, Morgan, Liz, and I worked great together and I would work with them again on another project as well.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment